To enhance operational efficiency at its Hungarian facility, a local enterprise procured high-performance rail-mounted container gantry cranes for cargo handling and material circulation in the container yard. After rigorous evaluation, our company was selected as the preferred partner in January 2025. We adopt a turnkey project model to deliver a comprehensive solution encompassing equipment supply, installation and commissioning, technical training, and end-to-end after-sales support, ensuring optimal operational performance for the facility.
To meet the operational requirements of the container yard, three rail-mounted container gantry cranes (RMG model) were custom-supplied, with core parameters and configurations precisely tailored to the on-site working conditions.
Device Name | Specifications and Models | Quantity | Core Configuration and Technical Standards |
Rail-mounted Container Gantry Crane (RMG model) | 40.5t-36m | 3 units | Lifting capacity 40.5t, span 36m, covering length 680m, lifting height 21m; working grade A7, outdoor operation design, static wind resistance above Level 12; lifting speed 2.3-36m/min (frequency conversion speed control), trolley running speed 6-100m/min; adopts driver's cabin (following trolley) control mode, equipped with 20'/40' rotatable telescopic container lifting device, and equipped with 12-rope mechanical anti-sway and electronic anti-sway functions. |
Case Features:
1.Cross-border Compliance Capabilities: Accurately align with EU and Hungarian technical standards, import/export regulations, and environmental requirements, while providing multilingual documentation and CE certification (EU product safety conformity mark) to address compliance challenges in cross-border procurement.
2.Turnkey Project Integration: We provide one-stop procurement solutions for overseas facilities by integrating all service stages including design, manufacturing, transportation, installation, commissioning, training, and after-sales service, which reduces communication and management costs.
3.Rapid Emergency Response System: We implement a 2-hour on-site response, 4-hour solution proposal, and 24-hour issue resolution mechanism, supported by lifetime maintenance and rapid spare parts supply to minimize production disruption risks.